East Hawaii News

Scheduled Hawai‘i Island lane closures on state roadways for July 19-25

Play
Listen to this Article
5 minutes
Loading Audio... Article will play after ad...
Playing in :00
A
A
A

Hawai‘i Department of Transportation announces the following lane closures and road work projects for state roadways on the Big Island during the week of July 19-25.

Cars are stalled in traffic because of tree trimming closing a lane on Highway 11 near Hilo. (Kelsey Walling/Big Island Now)

KANOELEHUA AVENUE (HIGHWAY 11)

HILO

  • Single lane closure on Kanoelehua Avenue (Route 11) possible in either direction between mile post 2.8 to 3.0, in the vicinity of East Palai Street, on Monday, July 21 to Friday, July 25 from 8:30 a.m. to 11:30 a.m. for maintenance on the pocket lane markings and crosswalk.

MAMALAHOA HIGHWAY (HIGHWAY 11)

PAHALA

  • Single lane closure on Mamalahoa Highway (Route 11) possible in either direction between mile post 49 to 50, in the vicinity of Hawaii Volcanoes National Park, on Monday, July 21 to Friday, July 25 from 8 a.m. to 2 p.m. for cutting grass.

NAALEHU

  • Single lane closure on Mamalahoa Highway (Route 11) possible in either direction between mile post 68 to 69.5, in the vicinity of 68 Mile Road and Red Cinder Road, on Saturday, July 19 from 8 a.m. to 2 p.m. for cutting grass.

OCEAN VIEW

  • Single lane closure on Mamalahoa Highway (Route 11) possible in either direction between mile post 70 and 76, vicinity of Easement Road, on Monday, July 21 to Friday, July 25 from 8:30 a.m. to 3 p.m. for removal of existing striping, striping, installation of centerline, rumble strip and pavement markers.

PAPA

  • Single lane closure on Mamalahoa Highway (Route 11) possible in either direction between mile post 84 and 86, vicinity of Old Mamalahoa Highway, on Monday, July 21 to Friday, July 25 from 8:30 a.m. to 3 p.m. for removal of existing striping, striping, installation of centerline, rumble strip and pavement markers.
  • Single lane closure on Mamalahoa Highway (Route 11) possible in either direction between mile post 89 and 93.5, vicinity of Papalani Place, on Monday, July 21 to Friday, July 25 from 8:30 a.m. to 3 p.m. for removal of existing striping, striping, installation of centerline, rumble strip and pavement markers.
ARTICLE CONTINUES BELOW AD
ARTICLE CONTINUES BELOW AD

CAPTAIN COOK

  • Single lane closure on Mamalahoa Highway (Route 11) possible in either direction between mile post 106 to 107, in the vicinity of Honaunau School and Rabbit Hill Road, on Monday, July 21 to Friday, July 25 from 8 a.m. to 2 p.m. for cutting grass and shoulder work.
  • Single lane closure on Mamalahoa Highway (Route 11) possible in either direction between mile post 107 to 109, in the vicinity of Rabbit Hill Road and Koa Road, on Saturday, July 19 from 8 a.m. to 2 p.m. for cutting grass and shoulder work.

VOLCANO ROAD (HIGHWAY 11)

MOUNTAIN VIEW

  • Single lane closure on Volcano Road (Route 11) possible in either direction between mile post 17 to 19, in the vicinity of Lehuanani Street, on Saturday, July 19 from 8 a.m. to 2 p.m. for mowing and shoulder work.
  • Single lane closure on Volcano Road (Route 11) possible in either direction between mile post 17 to 19, in the vicinity of Lehuanani Street, on Monday, July 21 to Friday, July 25, from 8 a.m. to 2 p.m. for mowing and shoulder work.

VOLCANO

  • Roving lane closure on Volcano Road (Route 11) possible in either direction between mile post 28 to 29, in the vicinity of Hawaii Volcanoes National Park, on Monday, July 21 to Friday, July 25 from 7 a.m. to 4 p.m. for HELCO installation of new pole and wires.

HAWAII BELT ROAD (ROUTE 19)

PAPAIKOU

  • Single lane closure on Hawaii Belt Road (Route 19) possible in either direction in the vicinity of mile post 8, near Indian Tree Road, on Saturday, July 19 from 8 a.m. to 2 p.m. for bridge maintenance.

NINOLE TO OOKALA

  • Single lane closure on Hawaii Belt Road (Route 19) possible in either direction between mile post 17 to 29, in the vicinity of Moonlight Road, on Saturday, July 19 from 8 a.m. to 2 p.m. for cutting grass.
  • Single lane closure on Hawaii Belt Road (Route 19) possible in either direction between mile post 17 to 29, in the vicinity of Moonlight Road, on Monday, July 21 to Friday, July 25 from 8 a.m. to 2 p.m. for cutting grass.
ARTICLE CONTINUES BELOW AD

OOKALA TO PAAUILO

  • Single lane closure on Hawaii Belt Road (Route 19) possible in either direction between mile post 30 to 35, on Monday, July 21 to Friday, July 25 from 8 a.m. to 2 p.m. for mulching, tree trimming, and shoulder work.

HONOKAA

  • Single lane closure on Hawaii Belt Road (Route 19) possible in either direction between mile post 42 to 44, on Saturday, July 19 from 8 a.m. to 2 p.m. for mulching, tree trimming, and shoulder work.

MAMALAHOA HIGHWAY (HIGHWAY 190)

WAIMEA

  • Single lane closure on Mamalahoa Highway (Route 190) possible in either direction between mile post 0 to 1, in the vicinity of Lindsey Road and Lalamilo Farm Road, on Monday, July 21 to Friday, July 25 from 8:30 a.m. to 3 p.m. for striping.

SOUTH KOHALA

  • Single lane closure on Mamalahoa Highway (Route 190) possible in either direction between mile post 12.2 to 16.4, in the vicinity of Saddle Road on Monday, July 21 to Friday, July 25 from 8:30 a.m. to 3 p.m. for striping.

KOHALA MOUNTAIN ROAD (HIGHWAY 250)

KAPAAU

  • Single lane closure on Kohala Mountain Road (Route 250) possible in either direction between mile post 8.5 to 11, in the vicinity of Kohala Ranch Road on Saturday, July 19 from 8 a.m. to 2 p.m. for tree trimming and shoulder work.

HAWI ROAD (HIGHWAY 250)

ARTICLE CONTINUES BELOW AD

HAWI

  • Single lane closure on Hawi Road (Route 250) possible in either direction at mile post 19, in the vicinity of Akoni Pule Highway on Monday, July 21 to Friday, July 25 from 8 a.m. to 2 p.m. for tree trimming and shoulder work.

PUAINAKO STREET (HIGHWAY 2000)

HILO

  • Single lane closure on Puainako Street (Route 2000) possible in either direction between mile post 0.5 to 2.2, in the vicinity of Kanoelehua Avenue and Komohana Street, on Monday, July 21 to Friday, July 25 from 8:30 a.m. to 3 p.m. for striping and installing new raised pavement markers.

Lane closure schedules can change at any time without notice. All projects are weather permitting.

A map of lane closures can be found online.

Sponsored Content

Subscribe to our Newsletter

Stay in-the-know with daily or weekly
headlines delivered straight to your inbox.
Cancel
×

Comments

This comments section is a public community forum for the purpose of free expression. Although Big Island Now encourages respectful communication only, some content may be considered offensive. Please view at your own discretion. View Comments
Loading Weekly Ad…